Эскорт в Москве только в MOLLY/24

Our solutions

for highways

for highways

for metropolis

for metropolis

for tunnels

for tunnels

for toll-roads

for toll-roads

M-18 Kola

 

Project name: The M-18 Kola Highway, Leningrad Oblast

Location: The M-18 Kola highway from Saint Petersburg through Petrozavodsk, Murmansk, and Pechenga to the Norwegian border (the Borisoglebsk International Checkpoint) at the section 12+609 - 256+455 km, Leningrad Oblast.

Project goals:

Improvement of traffic flows on the M-18 Kola highway;

  • Improvement of the capacity of the M-18 Kola highway;

  • Reducing the number of speed limit violations on the sections of the M-18 Kola highway;

  • Reducing the number of violations of the regulations for the transportation of heavy-weight and large-size freight;

  • Establishment of a technological base for the efficient control of traffic flows;

  • Reducing the time of travel to the destination for vehicles;

  • Increasing awareness for road users about the traffic conditions on the road; 

  • Reducing the load on the M-18 Kola highway;

  • Introduction of up-to-date tools and methodologies, tools for vehicle weight measurements, equipment and devices;

  • Reducing the negative environmental impact of vehicles on the M-18 Kola highway;

  • Improving road safety and reducing the number of accidents on the M-18 Kola highway;

Project objectives:

  • Automating the collection, storage, and processing of statistical data on traffic flows on the M-18 Kola highway;

  • Automatic and semi-automatic real-time monitoring of the current weather and environmental conditions on the M-18 Kola highway;

  • Automatic detection of speed limit violation on the sections of the M-18 Kola highway;

  • Automatic and semi-automatic instrument inspection of vehicles for the carrier’s compliance to the limitation on maximum weight and axle load.

  • Automatic and semi-automatic collection, storage, and processing of statistical data on the operating condition of the bridges and other parts of the infrastructure of the M-18 Kola highway, as well as the control of their operation;

  • Preventing traffic jams, congestion, and other disturbances on the road;

  • Automatic and semi-automatic traffic control (in normal mode);

  • On-line traffic management in the event of road incidents, difficult traffic conditions, adverse weather conditions, and other emergency situations;

  • Optimum use of the capacity of the M-18 Kola highway;

  • Reducing the average delay in the travel time of vehicles (the average delay of traffic flow);

  • Optimization of the logistics of traffic flows;

  • Automatic and semi-automatic information support for road users on the current road conditions, and for road services personnel on various features of the traffic flows, the current weather and environmental conditions, etc.;

  • Security of the technical facilities of the deployed system and other objects of the infrastructure of the M-18 Kola highway;

  • Reduction of vehicle emissions.

Types of activities: Production of the design documentation for the development of the Intelligent Transportation System for traffic control on the M-18 Kola highway;

Implementation stage: Production of the design documentation according to the sections “”Advanced Traffic Management System (ATMS)” and “Integrated Traffic Control Plan (ITCP)”.

Client: FSI “Sevzapupravtodor”.

Location: Leningrad Oblast.